img语言选择
中文简体
English
Products
Jiangsu Siming specializes in providing a series of cement concrete pavers
Location:
Homepage
/
Molds

Molds

Time of issue:2023-07-14 15:56:10

  When making the mold, it is necessary to provide the equipment model and its connection method, construction design drawings, especially considering the on-site working conditions and processes. The design end faces of the same shape and size will have significant differences if the working conditions are different, including the side plate, the connection part between the main machine and the mold, and whether there is steel reinforcement. Without distinguishing in advance, construction cannot be carried out on site once there are differences.

  There is an adjustment difference between the size of the mold and the size of the construction design drawings.

  The following are schematic diagrams of several common operating conditions

1111
111

Common Condition 1 Shoulder

Common Condition 2 Curb

111
111

Common working condition 3 V-shaped drainage ditch

Common working condition 4: anti-collision wall

111
111

Common working condition 5: rectangular ditch

Common working condition 6 Slope protection

Contact us

Service Hotline: 400-828-3588

Fax: +86-514-88221112

Address: No. 218 Jinwan Road, Baoying Economic Development Zone, Jiangsu Province

Website Map  |  Contact  |  Legal Notice. | Business license

Copyright:Jiangsu Siming Construction Machinery Co., Ltd

搜索
GO